Building science
Insulation - the Manor project
How the envelope was specified, and why
The problem this assembly solves
[Colby: what goes wrong in a conventional build, in homeowner language.]
What we specified and why
[Colby: the assembly, the products, the sequence. Rough notes are fine; I'll shape them.]
In sequence
[Progress photos: framing, insulation, air sealing, finish. Four to eight images.]
The result
[Colby: measured if possible - blower door, HERS, Energy Star - or what the owner noticed.]


